Hello friends, I am publishing the first edition of Updated Activity Codes MGNREGA. Many activities may be unavailable. Please keep an eye on this page for update. Also if you want me to add any activity in this place mail me at info@subho.net.

MGNREGA ACTIVITY CODES (UPDATED)
CODE DESC UNIT
ACT009 TEMPORARY TOILET NO.
ACT01941 SUPPLYING FITTING & FIXING TARPAULIN SHEET  SQMT
ACT028 PICKING UP OF JHAMA METAL/BRICK BATS ROAD MT.SQ
ACT03 CEMENT CONCRETE [1:4:8] USING 40MM SIZEB.H.G. METAL INCLUDING ALL COST CONVEYANCETAXES,ROYALIT,WATERING CURRING, ETC. COMPLETE CUM
ACT030 ROUGHENING OF BRICK BAT ROAD /JHAMA BAT ROAD MT.SQ
ACT05 CEMENT CONCRETE [1:3:6] USING 40MM SIZEB.H.G. METAL INCLUDING ALL COST CONVEYANCETAXES,ROYALIT,WATERING CURRING, ETC. COMPLETE CUM
ACT1009 STACKING MATERIALS NO
ACT101 EARTH WORK IN STONY EARTH AND GRAVELS MIXED WITH STONE AND BOULDERS NOT EXCEEDING 0.014 CUM IN VOL. WITHIN ALL LEAD AND  LIFT INCLUDING ROUGH DRESSING AND BREAKING CLODS TO MAXIMUM 5 CM TO 7 CM AND LAYING IN LAYER NOT EXCEEDING 0.3 M IN DEPTH AND AS PER SPECIFICATION APPROVED BY THE DEPT. CUM
ACT106 FILLING FOUNDATION AND PLINTH WITH SANDINCLUDING ALL LEADS AND LIFT WATERING, RAMMINGCOST, CONVEYANCE, TAXES AND ROYALTY ETC. CUM
ACT112 FINE DRESSING AND TURFING WITH ALL LEAD AND LIFT AS PER DIRECTION OF ENGINEER-IN-CHARGE. SQM.
ACT119 FIRST AID KIT RS.
ACT122 FIXING OF FILLER BOARD FOR EXPANSION JOINTS SQMT
ACT125 HONEY COMB MASONRY WITH  BRICKS  IN CEMENT MORTRAR (1:4) AND PLASTERED WITH 16MM, THICK CEMENT MORTAR (1:6) INCLUDING WHITE WASHING 2 COATS SQM
ACT13 32MM.TH. PIASAL WOOD OR LOCAL TEAK WOOD PANELLEDSHUTTERS MOULDED PANELS WITH ALL LABOUR, IRON FITTINGS,AND WOODEN HINGED CLEATS ETC. FITTED AND FIXED COMPLETEIN ALL RESPECT. BUT EXCLUDING THE COST OF IRON FITTINGS. SQM
ACT132 LABOUR CESS RS.
ACT133 LABOUR CHARGES FOR LAYING HUME PIPES RMT
ACT143 LABOUR FOR SOLING ROAD SURFACE WITH SOLING STONES INCLUDING FILLING THE INTERSTICES WITH EARTH AND ROLLING WITH HAND ROAD ROLLER BUT EXCLUDING COST AND CONVEYANCE OF SOLING STONES. CUM
ACT147 LABOUR FOR SPREADING MOORUM AND CONSOLIDATION WITH HRR INCLUDING WATERING INCLUDING COST AND CONVEYANCE OF MOORUM CUM
ACT160 PHOTOGRAPHS RS.
ACT162 PHOTOGRAPHS IN THREE STAGES RS.
ACT166 ANGANWANI HA.
ACT171 PROVISION FOR CRECH PER DAY
ACT173 PROVISION FOR DISPLAY BOARD NO.
ACT190 REMUNARATION TO GRAM SANJOJAK PER DAY
ACT192 REMUNERATION OF GRAM SANJOJAK DAY
ACT197 RIGID AND SMOOTH CENTRING AND SHUTTERING WORK INCLUDING FALSE WORK AND DISMANTALLED THEM AFTER CASTING ( MASS CONCRETE) SQM
ACT204 EARTH WORK IN EXCAVATION IN STONEY EARTH INCLUDING ALL LEADS AND LIFTS INCLUDING ROUGH DRESSING AND BREAKING CLODS DEPOSITED THE EXCAVATED MATERIALS AWAY FROM WORK SITE. CUM
ACT22 BLINDING ROAD SURFACE WITH GRAVEL 6MM THICK INCLUDING ALL COST CONVEYANCE TAXES & ROYALITY ETC COMPLETE SQM
ACT221 TEMPORARY SHED RS.
ACT222 TRANSPARENCY PILLAR RS.
ACT223 WAGES FOR WATER SUPPLY DAY
ACT229 WATERING CHARGES NO.
ACT232 WORK SITE FACILITIES LIKE TEMPORARY SHADE RS
ACT24 CEMENT CONCRETE [1:2:4] USING 12MM SIZE H.G. CHIPS INCLUDING ALL COST CONVEYANCETAXES,ROYALIT,WATERING CURRING, ETC. COMPLETE CUM
ACT246 CEMENT CONCRETE (1,3,6) CUM
ACT2525 FENCING WITH MOSQUITO NET SQM
ACT2526 COVERING WITH STRAW SQM
ACT2527 USING SPICES TO PROTECT FROM ANT KG
ACT254 FITTING AND FIXING DOOR AND WINDOW FRAME NOS.
ACT259 25 MM THK. ARTIFICIAL STONE FLOORING SQM
ACT262 20MM THK. PLASTER (6,1) CEMENT SAND MORTER SQM
ACT28 CEMENT CONCRETE M25 GRADE WITH CRUSHED GRANITE COARSE AGGREGATE OF SIZE 20MM AND DOWN GRADED MIXED IN BATCHING AND MIXING PLANT INCLUDING COST OF ALL MATERIALS, MACHINERIES AND LABOUR AND TRANSPORTATION OF MIXED CONCRETE WITHIN INITIAL LEAD OF 1KM BY MECHANICAL MEANS AND LAYING IN DAMS, BARRAGES, POWER HOUSE AND PEN STOCK WITH ALL LIFTS/DELIFTS UPTO 1.5M HEIGHT ABOVE AVERAGE GROUND LEVEL IN RESPECTIVE BLOCKS AS PER DIRECTION OF ENGINEER-INCHARGE. CUM
ACT283 CARRYING BY HEADLOAD OF CONSTRUCTION MATERIALS FROM ROAD SIDE TO WORK SITE NOS
ACT288 EARTH WORK IN EMBANKMENT LIFTUP TO 1.5M IN DIFFERENT TYPES OF SOIL INCLUDING REMOVING, SPREADING OR STACKING THE SOPILS WITHIN DIFFERENT LEAD THE SIDES OF TRENCHES, LEVELING, DRESSING AND RAMMING THE BOTTOM, BAILING OUT WATER CUM
ACT289 FINE DRESSING AND CHILCHALLING WORK INCLUDING BREAKING CLODS IN THE FORMATION AND SIDE SLOPE OF EMBANKMENT AND CANAL BED TO REQUIRED SLOPE CAMBER AND GRADE SQM
ACT293 WATER CARRIER NO
ACT298 EARTHWORK IN EXCAVATION IN FOUNDATION TRENCHES OR DRAIN M3
ACT299 LAYING SOILING TO PROPER CAMBER M2
ACT300 CMENT CONCRETE WITH GARDED STONE CHIPS EXCLUDING SHUTTERING 40MM M3
ACT301 LABOUR FOR SHUTTERRING WITH CENTERING AND NECESSARY STAGING M2
ACT302 BREAKING OF STONE MATERIAL WITH SATGING M3
ACT303 COLLECTING AND BREAKING OF LOCAL STONE M3
ACT304 CARRAIGE OF CONSTRUCTION MATERIAL ON HEAD LOAD M3
ACT305 CARRAIGE OF CONSTRUCTION MATERIAL BAGS
ACT306 DRY RUBBLE MASONRY WALL WITH BOULDER M3
ACT307 RUBBLE MASONRY WORK WITH ANY KIND OF MORTAR M3
ACT309 BENCH CUTTING IN HILLY AREA MAINTAINING PROPER GRADES M3
ACT311 LAYING SOILING TO POPER CAMBER HAND PACKING SPREADING POWDERED EARTH IN THE INTERSTICES WITH DEPARTMENTAL BRICKS AND STONES M2
ACT313 MAKING V SHAPDE DRAIN IN HILL ROAD OR IN CUTTING WITH DRY BOULDERS INCLIDING PLACING POWDERED EARTH IN THE SURFACE M
ACT315 CEMENT CONCRET WORKS WITH GRADED STON CHIPS M3
ACT316 COLLECTING AND BREAKING FROM SURFACE AND OR DIGGING INTO GROUND AT QUQRRY INCLUDING STACKING BOULDER M3
ACT317 COLLECTING AND BREAKING FROM SURFACE AND OR DIGGING INTO GROUND AT QUQRRY INCLUDING STACKING SAND M3
ACT318 COLLECTING AND BREAKING FROM SURFACE AND OR DIGGING INTO GROUND AT QUQRRY INCLUDING STACKING STONECHIPS M3
ACT320 CARRIAGE OF CONSTRUCTION MATERIALS FROM A NEARBY ROAD POINT ON HEAD LOAD M3
ACT3201 BLACK ANNEALED WIRE KG
ACT3202 IRON BUTT HINGE PCS
ACT3203 IRON SOCKET BOLT PCS
ACT3204 IRON HASP BOLT PCS
ACT3205 D-TYPE HANDLE PCS
ACT3206 VENTILATOR PCS
ACT3207 LIME (SHEEL) KG
ACT3208 LIMER (STONE) KG
ACT3209 GUM KG
ACT321 SURKI SAND LIME CEMENT PLASTER WORK WITH MATERIAL SUPPLIED M2
ACT3210 CHECK TILES SQUARE METRE
ACT3211 CI PIPE SQUARE METRE
ACT3212 SCHEME DETAILS PRINTED ON WALL PICE
ACT3213 COCONUT WIRE KG
ACT3214 BAMBOO NO
ACT3215 PVC RAINWATER PIPE NO
ACT3216 ANODISED ALLUMINIUM ALDROP EACH
ACT3217 FROM WORK SQM
ACT3219 HARD PAPER KG
ACT322 SPREADING AND CONSOLIDATION OF R.B.M SQM
ACT3220 PRIMER LTR
ACT3221 ROPE KG
ACT3222 SAL MALAYASIA CUM
ACT3223 TOR STEEL KG
ACT3224 WATER MUG EACH
ACT3225 WATER POT EACH
ACT3226 WOOD GAMMER CUM
ACT323 SPREADING AND CONSOLIDATING OF SINGLES CUM
ACT324 EARTHWORK IN EXCAVATION TOMAKE FORMATION OF ROADS IN HILLY TRACKS INCLUDING REMOVING SPREADING OR STACKING OF SPOILS SUITABLY ETC… M3
ACT325 CEMENT CONCRETE WITH 20 MM DOWN STONE CHIPS EXCLUDING REINFORCEMENT AND SHUTTERING IF ANY…. M3
ACT326 DRY RUBBLE MASSONARY WITH CEMENT MORTAR… M3
ACT327 CARRIAGE OF BOULDERS ON HEAD LOAD… M3
ACT328 CARRIAGE OF CEMENT ON HEAD LOAD BAGS
ACT329 CARRIAGE OF STONE CHIPS ON HEAD LOAD M3
ACT33 CEMENT PLASTER (1:4) SQM
ACT339 DRY RUBBLE MASONRY WALL WITH BOULDERS OBTAINED FROM NEARBY STACKS WITHIN A LIFT OF 1.5M… MT.CU
ACT341 REINFORCEMENT FOR REINFORCED CONCRETE WORK IN ALL SORTS OF STRUCTURES INCLUDING DISTRIBUTION BARS, STRRUPS, BINDERS ETC…. KG
ACT344 NEAT CEMENT PUNNING ABOUT 1.5MM THICK IN WALL, DADO, WINDOW, SILLS, FLOOR, DRAIN ETC. MT.SQ
ACT345 COLLECTING AND BREAKING FROM SURFACE AND DIGGING INTO GROUND AT QUARRY INCLUDING STACKING (FOR HILLY AREA). MT.CU
ACT346 CARRIAGE OF CONSTRUCTIONAL MATERIALS FROM NEARBY QUARRY OR ROAD POINT BY HEAD LOAD UPTO WORK SITE. MT.CU
ACT348 SAND M3
ACT349 STONECHIPS M3
ACT35 CESS RS.
ACT350 BOULDER M3
ACT356 Carriage of construction materials from nearby quarry, stacks river point or Road point on head load to a distance of 100m beyond the etcoriginal lead of 30m…..,.  M3
ACT356 CARRIAGE OF CONSTRUCTION MATERIALS FROM NEARBY QUARRY, STACKS RIVER POINT OR ROAD POINT ON HEAD LOAD TO A DISTANCE OF 100M BEYOND THE ORIGINAL LEAD OF 30M…..,.ETC  M3
ACT357 WAGES FOR SUPERVISOR PERMD
ACT358 WORK CHARGE SAE MND
ACT359 DISPLAY BOARD PCS
ACT36 CLEANING OF SHRUB JUNGLE, UPROOTING SMALL BUSHES AND TREES SQM
ACT360 REST SHED NOS
ACT361 CRECHE SHED NOS
ACT362 SKILLED MND
ACT364 CARRAGE OF CONSTRUCTION MATERIAL ON HEAD LOAD M3
ACT366 SHURB CLEARANCE INCLUDING CUTTING OF LIGHT BUSHES AND REMOVAL OF OTHER VEGETATION AND CLEANING THE SITE HECTOR
ACT367 CARRIAGE OF CONSTRUCTION MATERIAL FROM A NEARBY QUARRY (STONE CHIPS BOULDER AND SAND) ON HEAD LOAD TO A DISTANCE OF 100 M AND BEYOND 100M AND UPTO 500M M3
ACT372 CARRYING THE SAND BAGS PROPERLY AND ARRANGE AS PER DIRECTION WITHIN A LEAD OF 30 MTR.  BAGS
ACT374 LAYING EDGING INCLUDING PREPARATION OF BED HAND PACKING, FIXING IN POSITION BACKFILLING WITH DEPARTMENTAL BRICKS  STONES SUPPLIED M
ACT375 LABOUR FOR NEAT CEMENT PUNNING M2
ACT376 CONSUMPTION OF MATERIALS- FOR CRM PLASTER CC WORKS PUNNING M3
ACT378 CARRAIGE OF CONSTRUCTION MATERIALS FROM A NERA BY QUARRY HEAD LOAD TO DISTANCE OF 100M BEYOND ORIGINAL LEAD OF 30M CEMENT BAGS
ACT379 CARRIAGE OF SAND FROM NEAR BY QUARRY ON HEAD LOAD M3
ACT383 IIRON ROAD KG
ACT384 IRON ROD KG
ACT387 PROVIDING AND LAYING CEMENT CONCRETE M20 WITH REINFORCEMENT M3
ACT388 PROVIDING AND LAYING CEMENT CONCRETE M15 WITH OR WITHOUT REINFORCEMENT M3
ACT389 12MM DIA BAR LAYING STEEL REINFORCEMENT IN RCC KG
ACT390 LABOUR FOR SHUTTERING WITH CENTERING NECESSARY KG
ACT391 MAKING V SHAPE DRAIN IN HILL AREAS OR IN CUTTING WITH DRY BOULDERS ETC.. M
ACT392 EARTH WORK IN EXCAVATION IN FOUNDATION TRENCHES OR DRAIN M3
ACT393 LABOUR FOR SHUTTERING WITH CENTERING AND NECESSARY STAGGING M3
ACT397 SKILLED LABOUR MANDAYS
ACT398 SUPERVISOR MANDAYS
ACT40 CLEANING OF WATER HYACINTH SQM
ACT400 SHRUB CLEARANCE INCLUDING CUTTING OF LIGHT BUSHES AND REMOVED OF THE VEGETATION AND CLEARING THE SITE MTSQ
ACT401 EARTH WORK IN EXCAVATION IN FOUNDATION IN DIFFERENT SOIL INCLUDING REMOVING, SPREADING THE SOILS WITHIN DIFFERENT LEAD AND LEVELING DRESSING ETC AS REQUIRED, COMPLETE MTCU
ACT402 EARTH WORK IN FILLING IN FOUNDATION AND TRENCHES UP TO FLINT. EXCAVATION EARTH. SAME AS EARTHWORK. BACK SIDE OF WALL MTCU
ACT403 DRY RUBBLE MASONRY WALL WITH BOULDERS OBTAINED FROM NEARBY STACKS WITHIN A LIFT OF 1.5 M. MTCU
ACT404 LAYING SOILING TO PROPER CAMBER, HAND PACKING SPREADING POWDERED EARTH IN THE INTERSTICS WITH BOULDER CARRYING FROM RAMBI RIVER BED…………. MTSQ
ACT405 MAKING V SHAPED DRAIN IN HILL AREAS ROAD OR IN CUTTING WITH DRY BOULDER INCLUDING PLACING POWERED EARTH IN THE SURFACE AND IN THE SIDE OF THE DRAIN PROPERLY M
ACT406 CEMENT CONCRETE WITH GRADED STONE CHIPS 20 TO 30 MM SIZE EXCLUDING SHUTTERING AND REINFORCEMENT (1.3.6)………. MTCU
ACT407 LABOUR FROM SHUTTERING WITH CENTERING AND NECESSARY STAGING UPTO 4 M. USING APPROVED STOUT PROPS AND THICK HARD WOOD PLACKS OF APPROVED THICKNESS WITH REQUIRED BRACHING INCLUDING FITTING…………….. MTSQ
ACT408 12 MM THICK SAND CEMENT PLASTERS WORK WITH MATERIALS SUPPLIED AT WORK SITE MTSQ
ACT409 LABOUR FOR NEAT CEMENT PUNNING WORK SAME AS PLASTERING MTSQ
ACT410 COLLECTING AND BREAKING FROM SURFACE AND DIGGING INTO GROUND AT QUARRY INCLUDING STACKING MTCU
ACT411 CARRIAGE OF CONSTRUCTIONAL MATERIALS FROM NEARBY QUARRY ROAD POINT BY HEAD LOAD UP TO WORK SITE. MTSQ
ACT412 CARRIAGE OF CEMENT UP TO WORK SITE 155 BAGS RS. 20 BAGS BAGS
ACT413 PLASTER WITH SAND AND CEMENT MORTAR INCLUDING ROUNDING CORNERS AS DIRECTED AND RACKING OUT JOINTS OF CONCRETE SURFACE INCLUDING…….. MTSQ
ACT427 SAND (LOCAL RIVER) WORK IN FILLING IN FOUNDATION TRENCHES PLINTH ETC. M3
ACT428 SURFACE DRESSING OF THE GROUND INCLUDING REMOVING VEGETATION UNEQUALITIES ETC M2
ACT429 SHRUB CLEARANCE INCLUDING CUTTING OF LIGHT BUSHES REMOVAL OF OTHER VEGETATION ETC. M2
ACT430 FILLING EMPTY GUNNY BAGS WITH DRY EARTH OR SAND STITCHING BAGS… BAGS
ACT431 LAYING, EDGING INCLUDING PREPARATION OF BED , AND HAND PACKING WITH HARD BOULDERS R.M.
ACT432 LABOUR FOR SHUTTERING WITH CENTERING AND NECESSARY STACGING USING APPROVED STOUT PROPS..ETC M2
ACT433 REINFORCEMENT FOR REINFORCE CONCRETE WORK IN ALL SORTS OF STRUCTURE INCLUDING CUTTING, BENDING, BINDING ETC KG
ACT434 RUBBLE MASSONARY WORK WITH NAY TYPE OF MORTAR….. M3
ACT435 CEMENT PLASTER WORK WITH MATERIALS SUPPLIED AT SITE…ETC M2
ACT436 LABOUR FOR NEAT CEMENT PUNNING….ETC M2
ACT437 MAKING V SHAPED DRAIN IN HILLY ROAD OR IN CUTTING WITH DRY BOULDERS ETC… R.M.
ACT438 MAKING SAUSAGE (GABION) WORK BY FILLING BOULDERS OBTAINED FROM NEARBY STACKS…ETC M3
ACT439 CARRIAGE OF SAND ON HEAD LOAD… M3
ACT441 PLUMB CONCRETE WITH BOULDERS OF SIZE 150MM AND ABOVE EXCLUDING REINFORCEMENT, SHUTTERING…. M3
ACT455 CREACH LABOUR NOS
ACT465 CARRIAGE OF CEMENT ON HEAD LOAD  ETC…. M3
ACT47 CONSTN OF TRANSPERENCY BOARD INCLUDING PLASTERING, PAINTING & WRITING ETC COMPLETE.  SQMT
ACT472 CUTTING OF TREES NOS
ACT474 F.A. BOX 1
ACT475 SAND C.FT 1
ACT476 CEMENT ACC 1
ACT488 BOX CUTTING IN ROAD EMBANKMENT AND REMOVING THE SPOILS AND SPREADING OVER ON THE SHOULDER AND CONSOLIDATING AND DRESSING SUB GRADE TO CORRECT AND GRADE SQM
ACT489 SPREADING AND CONSOLIDATION WITH MATERIALS SUPPLIED AT THE SITE(LOOSE THICKNESS OF RBM 0.075M) SQM
ACT491 SKILLED TECHNICAL PERSON NO
ACT505 LABOUR CHARGE FOR SHUTTERING M2
ACT506 CEMENT AND SAND PLASTER 15MM THICK WITH 1-4 M2
ACT507 LABOUR FOR FITTING AND FIXING G. S. PIPE WITH NECESSARY PARTS ETC. MTS
ACT508 EARTHWORK IN EXCAVATION TO MAKE FORMATION OF ROADS IN HILLY TRACKS   A) MIX SOIL M3
ACT509 EARTHWORK IN EXCAVATION TO MAKE FORMATION OF ROADS IN HILLY TRACKS   B) HARD SOIL M3
ACT51 COST & CARRIAGE OF HUME PIPES RMT
ACT531 LOOSE ANG SOFT SOIL WITH MOORUM, LEAD UPTO 80 FT  LIFT UPTO 5 FT (UPTO 2 FT DEPTH FROM GL) CFT
ACT532 MIXED MEDIUM HARD SOIL WITH MOORUM, KANKAR, PEBBLES, LEAD UPTO 80 FT LIFT UPTO 5FT (NEXT 2 FT  4 FT DEPTH FROM GL) CFT
ACT533 MIXED MEDIUM HARD SOIL WITH MOORUM, KANKAR, PEBBLES, LEAD UPTO 80 FT  LIFT 5 TO 8 FT (6FT DEPTH FROM GL) CFT
ACT534 HARD SOIL LATERITIC SOIL, LEAD UPTO 80 FT  LIFT BEYOND 8 FT UPTO 11.5 FT (8 FT DEPTH GL) CFT
ACT535 HARD SOILLATERITIC SOIL, LEAD UPTO 80 FT  LIFT BEYOND 8 FT UPTO 11.5 FT ( 10 FT DEPTH GL) CFT
ACT538 SEMI SKILLED MANDAYS
ACT541 MANDAYS REQUIRED FOR FILLING THE LOWLAND AND LAND DEVELOPMENT, LIFT UPTO 5FT AND LEAD BEYOND 160 UPTO 240 FT. MD
ACT542 MANDAYS REQUIRED FOR MAKING SPOIL BANK WHEN LIFT BEYOND 5FT UPTO 8 FT AND LEAD UPTO 80 FT 160 FT. MD
ACT543 MANDAYS REQUIRED IN THIS STAGE WHEN LIFT BEYOND 8 FT.-11.5 FT AND LEAD UPTO 160 FT TO 240  FT. MD
ACT544 FINE DRESSING AND CHILCHALLING WORK INCLUDING …… GRADE. MD
ACT554 USING OF POLYTHENE SHEET FOR PERPARE CEMENT CONCRETE [1:3:6].   CUM
ACT565 SEMI SKILLED LABOUR (SUPERVISOR, PREPARATION OF MUSTER ROLL OF 25 NOS. OF USK LABOUR AND TAKING MEASUREMENT IN RESPECT OF VOLUMN OF WORK AND PREPARED MEASUREMENT SHEET IS RESPECT OF MEASUREMENT) NO
ACT576 DRAIN WORK (SOLING FLAT SIDE) M2
ACT583 HIRE CHARGE FOR VIBRATOR.  PER HOUR
ACT584 APPLYING OF ORGANIC MANURE, LIME, INSECTISIDE, NYLON NET ETC. FOR PLANTATION. KG
ACT595 PILLING CUM
ACT60 CRECHE FACILITY RS.
ACT623 STONE CHIPS 20 MM DOWN CUM.
ACT624 HIRE SHUTTERING INCLUDING NAILS SQM
ACT627 HIRE CHARGES FOR MIXTURE MACHINE INCLUDING 1 OPERATOR NOS.
ACT628 NAIL KG.
ACT643 BRICK WORK WITH ANY CLASS OF BRICKS WITH CEMENT MORTAR OR CINDER/ SURKI/SAND – LIME MORTAR INCLUDING RAKING OUT JOINTS SCAFFOLDING & CURING ETC M3
ACT644 125 MM THICK BRICK WORK WITH ANY CLASS OF BRICK WITH ANY TYPE OF MORTAR INCLUDING CARRIAGE OF MATERIALS FROM STACK WITHIN A DISTANCE OF 30 M. AND CURING, SCAFFING ETC. COMPLETE M2
ACT66 DRESSED SEASONED SAL WOOD WORK FRAMED AND FIXED[WROUGHT AND PUT UP] IN TRUSSES, PURLINS, FRAMES OF DOORS , WINDOWS AND BEAMS PER ONE CUM. CUM
ACT6666 SETTING OF PIT (COLLECTION OF DUST SOIL AND COW DUNG) MANDAYS
ACT66666 SETTING OF PIT (COLLECTION OF DUST SOIL AND COW DUNG) MANDAYS
ACT6668 COLLECTION OF RAW MATERIALS FOR 3 PRODUCTION CYCLES MANDAYS
ACT6669 CUTTING,PROCESSING,SETTING & DECOMPOSITION OF RAW MATERIAL FOR 3 MONTHS MANDAYS
ACT6670 TURN OUT OF RAW MATERIALS IN INTERVAL FOR 3 PRODUCTION CYCLES MANDAYS
ACT6671 VERMI COMPOST COLLECTION,SIEVING,STORAGE ETC FOR 3 PRODUCTION CYCLES MANDAYS
ACT6672 PREPARATION OF ANOTHER PILE OF RAW MATERIAL 25 DAYS BEFORE REMOVING THE COMPOST MANDAYS
ACT680 EARTHWORK IN EXCAVATION IN FOUNDATION TRENCHES OR DRAIN IN ALL SORTS OF SOIL INCLUDING REMOVING………………ETC M3
ACT709 75 MM THICK BRICK WORK WITH ANY CLASS OF BRICK AND WITH ANY TYPE OF MORTAR INCLUDING CARRIAGE OF MATERIALS FROM NEAR BY STACK WITHIN A DISTANCE OF 30M. AND CURING AND LABOUR FOR SCAFFING ETC.COMPLETE SQM.
ACT718 REMOVAL OF WATER HYACINTH SQM.
ACT724 75 MM THICK BRICK WORK WITH ANY CLASS OF BRICK AND WITH ANY TYPE OF MORTAR INCLUDING CARRIAGE OF MATERIALS FROM NEAR BY STACK WITHIN A DISTANCE OF 30M. AND CURING AND LABOUR FOR SCAFFING ETC. SQM.
ACT727 LABOUR FOR TAKING OUT OLD SOLING INCLUDING REMOVING DEBRIES TO FLANK OR BERM, SORTING OUT SERVICEABLE MATERIAL & STAKING SQM.
ACT728 PROTECTIVE WALLING TO RETAIN EMBANKMENT WITH DRUM SHEET OR BAMBOO WALLING PIECES INCLUDING CUTTING, FLATENING AND PERFORATING THE SHEET (EXCLUDING THE COST OF SHEET) SUPPLIED AT SITE. MTR
ACT729 EMBANKMENT PROTECTION WITH PITCHING WITH MATERIALS SUPPLIED AT SIDE (A GROUP OF 1 SKILLED AND 4 MAZDOOR TO WORK AT A TIME). SQM.
ACT73 EARTH WORK EXAVATION IN ORDINARY SOIL WITH ALL LEAD AND LIFT INCLUDING ROUGH DRESSING AND BREAKING OF CLODS TO MAXIMUM 5 CM TO 7 CM AND LAYING IN LAYERS NOT EXCEEDING 0.3 M IN DEPTH AS PER DIRECTION OF ENGINEER IN CHARGE. CUM
ACT730 DISMANTLING ALL TYPES OF MASONRY EXCEPT CEMENT CONCRETE PLAIN OR REINFORCED , STACKING SERVICEABLE MATERIALS AT SITE AND REMOVING RUBBISH AS DIRECTED WITHIN A LEAD 75 M. CUM.
ACT731 DISMANTLING ALL TYPES OF PLAIN CEMENT CONCRETE WORKS, STACKING SERVICEABLE MATERIALS AT SITE AND REMOVING RUBBISH WITHIN A LEAD OF 75M. CUM.
ACT732 LABOUR FOR LAYING OF BRICK KHOA OF ORDINARY BATS OF SIZE(38M X 63 MM) IN 100 MM LAYER FILLING IN GAPS WITH SMALL PIECES RAMMED AND COMPACTED AS DIRECTED WITH TRUE TO LEVEL AND GRADE. CUM.
ACT733 25 MM THICK D.P.C (4:2:1) WITH STONE CHIPS 6 MM DOWN, DOUBLE CHEQUERED COMPLETE INCLUDING MIXING WATER PROOFING COMPOUND AS DIRECTED COMPLETE IN ALL RESPECT. SQM.
ACT734 GREY ARTIFICIAL STONE IN FLOOR, SKARTING, DADO, CHIPS (6 MM DOWN) LAID IN PANELS INCLUDING 3 MM THICK TOPPING INCLUDING LEAVELLING OFF CORNERS SQM.
ACT735 125 MM THICK BRICK WORK WITH ANY CLASS OF BRICK WITH ANY TYPE OF MORTAR INCLUDING CARRIAGE OF MATERIALS FROM STACK WITHIN A DISTANCE OF 30 M. AND CURING, SCAFFING SQM.
ACT736 75 MM THICK BRICK WORK WITH ANY CLASS OF BRICK AND WITH ANY TYPE OF MORTAR INCLUDING CARRIAGE OF MATERIALS FROM NEAR BY STACK WITHIN A DISTANCE OF 30M. AND CURING AND LABOUR FOR SCAFFING SQM.
ACT737 FLUSH POINTING OR RULE POINTING TO WALLS ETC. SQM.
ACT738 FINE DRESSING & CHILCHALLING/ SURFACE DRESSING/ COMPACTING THE SUB-GRADE WORK INCLUDING BREAKING CLODS IN THE FORMATTING AND SIDE SLOPE OF EMBANKMENT AND IN CANAL BED TO REQUIRED SLOPE, CAMBER AND GRADE. SQM.
ACT739 LABOUR FOR DRIVING SAL BULLAH/EUCALYPTUS BULLAH PILES BY MONKEY IN SORTS OF SOIL INCLUDING HOISTING AND PLACING IN POSITION, PROTECTING THE PILE HEAD WITH IRON RING AND CUTTING AND SHAPING HEADS BEFORE AND AFTER DRIVING. MTR
ACT740 MAKING GABION WITH SPLIT BAMBOO STRIPS INCLUDING CARRYING THE STRIPS FROM THE STACKS, FITTING FIXING WITH NAILS. NOS.
ACT741 RE-CARRIAGE OF CONSTRUCTION MATERIALS FROM NEAREST ROAD POINT TO WORKING SITE BY TOLLY VAN.DISTANCE CARRIED UP TO 2 KM. NOS. OR CUM
ACT742 MATERIALS – HIRE CHARGE OF POWER ROLLER. PER DAY
ACT747 CEMENT CONCRETE (1153) P.C.C ROAD ITEM NO. A(III) MANDAYS
ACT748 CURRING THE CONCRETE WORK MANDAYS
ACT749 EARTH WORKING EXCAVATION TO FROM ROAD EMBANKMENT IN MIXED ORDINARY SOIL MANDAYS
ACT750 SAND FILLING ON SUBGRADE MANDAYS
ACT753 POTTING MIXTURE PREPARATION AND FILLING UP OF POLYPODS (250 POLYPOD PER MANDAYS) MANDAYS
ACT756 PLANT PROTECTION MEASURES MANDAYS
ACT757 SEED TREATMENT BEFORE SOWING MANDAYS
ACT758 LABOUR FOR SOAK AND DRY TREATMENT OF SEEDS INCLUDING PREPARATION OF COWDUNG SLURRY MANDAYS
ACT759 SOWING OF SEEDS IN MOTHER BED MANDAYS
ACT760 WATERING, WEEDING AND CLEANING MANDAYS
ACT761 PREPARATION OF STUMP CUTTINGS AND PRUNING OF ROOTS MANDAYS
ACT762 CHEMICAL SPRAYING MANDAYS
ACT763 GRAFTING MANDAYS
ACT764 MONITORING OF THE UNION FOR ONE MONTH MANDAYS
ACT765 AIR LAYERING IN MOTHER PLANTS MANDAYS
ACT7779 EARTHWORM KG
ACT79 EARTH WORK IN EXCAVATION IN FOUNDATION  INCLUDING ALL LEADS AND LIFTS INCLUDING ROUGH DRESSING AND BREAKING CLODS DEPOSITED THE EXCAVATED MATERIALS AWAY FROM WORK SITE. CUM
ACT792 TILES PILLING WORK  NO
ACT793 LABOUR FOR CURING WITH WATER MANDAYS
ACT795 EARTH WORK IN EXCAVATION FOR ROAD EMBANKMENT FOR ORDINARY MIXED SOIL, LEAD UPTO 80FT & LIFT UPTO 5FT @ 62CFT / USK MD NOS.
ACT814 DRESSING AND CHILLING MANDAYS
ACT815 RUBBLE MASONRY IN CEMENT 6 1 WITH DRESSED STONE M3
ACT816 REINFORCEMENT IN REINFORCED CONCRETE WORK WITH DISTRIBUTION BARS KGS
ACT817 COLLECTION AND BREAKING OF STONE CHIPS M3
ACT819 UN SKILLED LABOUR MANDAYS
ACT826 UN KILLED OF  EARTH WORK MANDYS
ACT827 UN SKILLED FOR DRINKING WATER SERVER  PREPARATION OF REST SHADE OR CHILD CARE MANDAYS
ACT828 SEMI SKILLED FOR SUPERVISING THE WORK MANDAYS
ACT832 LAND PREPARATION (INCLUDING SOIL STERILIZATION) MDS
ACT833 BED PREPARATION MDS
ACT834 STRUCTURAL PREPARATION MDS
ACT835 INTER CULTURAL OPERATION MDS
ACT836 BIO-SPRAY MDS
ACT837 IRRIGATION MDS
ACT850 REINFORCE CEMENT CONCRETE ( 1 2 4) WITH 20MM DOWN STONE CHIPS EXCLUDING REINFORCEMENT AND SHUTTERING IF ANY M3
ACT851 LABOUR FOR REINFORCEMENT FOR R.R.C. WORKS OF ALL TYPES INCLUDING CUTTING…… KG
ACT852 COLLECTION AND BREAKING OF STONE CHIPS….. M3
ACT869 DROUGHT PROOFING HEC
ACT87 EARTH WORK IN EXCAVATION IN HARD SOIL INCLUDING ALL LEADS AND LIFTS INCLUDING ROUGH DRESSING AND BREAKING CLODS DEPOSITED THE EXCAVATED MATERIALS AWAY FROM WORK SITE. CUM
ACT874 CONCRETE ROAD KM
ACT875 EARTHEN ROAD KM
ACT876 EXCAVATION OR RE-EXCAVATION POND CUM
ACT882 WATER CONSERVATION CUM
ACT883 PUMPING OUT WATER CAUSED BY SPRING, SEEPAGE, DRAIN WATER MAINS OR WELL POINT PUMPING ETC. DURING EXCAVATION OF POND LAST LAYER OF 1.5 MT. DEPTH CUM
ACT884 HIRE CHARGE FOR WATER PUMP AND COST OF DEISEL PER DAY
ACT885 SAL WOOD WORK ROUGH DRESSED INCLUDING NECESSARY HOISING AND FITTING, FIXING IN THE POSITION WITH BOLTS NUT NAILS BUT EXCLUDING COST OF BOLTS, NUTS AND WASHERS CUM
ACT886 LABOUR FOR UNDRESSED SAL WOOD IN SCANTLING IN BRIDGE FLOOR, RALLING POST WHEEL GAURD CUM
ACT887 LAYING SOLING TO PROPER CAMBER, HAND PACKING, SPREADING, POWERED EARTH IN THE INTERSTICS WITH STONE SUPPLIED AT SIDE. SQM
ACT8877 MARK-II TUBEWELL NO
ACT888 UN SKILD LABOUR WAGES MDS
ACT89 EARTH WORK IN EXCAVATION IN ORDINARY SOIL INCLUDING ALL LEADS AND LIFTS INCLUDING ROUGH DRESSING AND BREAKING CLODS DEPOSITED THE EXCAVATED MATERIALS AWAY FROM WORK SITE. CUM
ACT891 PLANTATION ACRE
ACT908 EARTHWORK IN EXCAVATION FOR EMBANKMENT CANAL TANK INCLUDING…. COMPLETE CUM
ACT909 LAYING SOLLING TO PROPER CAMBER AND HAND PACKING SPREADING POWDERED EARTH  AT SITE SQM
ACT910 CEMENT CONCRETE WITH GRADED STONE CHIPS SLASH GRAVEL EXCLUDING SHUTTERING AND REINFORCEMENT CUM
ACT911 SUSKI , SAND,  LINE CEMENT PLASTER WITH MATERIALS SUPPLIED AT SITE SQM
ACT912 LABOUR FOR SHUTTERING WITH CENTERING AND NECESSARY STAGING OF WORK SQM
ACT913 CEMENT CONCRETE WITH CHIPS EXCLUDING SHUTTERING OF REINFORCEMENT CUM
ACT914 NEAT CEMENT PUNNING OF ABOUT 1.50 MM THICK SQM
ACT915 LABOUR FOR LOOK AFTER CHILDREN MANDAYS
ACT916 REINFORCEMENT WORKS FOR REINFORCED CONCRETE WORK IN ALL SORTS OF STRUCTURE INTERSECTION COMPLETE KG
ACT939 RING BASIN MAKING FOR MANURING FOR TWO SPLITS MANDAYS
ACT94 EARTH WORK IN HARD SOIL OR GRAVELLY SOIL WITHIN ALL LEAD AND  LIFT INCLUDING ROUGH DRESSING AND BREAKING CLODS TO MAXIMUM 5 CM TO 7 CM AND LAYING IN LAYERS NOT EXCEEDING 0.3 M IN DEPTH AND AS PER THE DIRECTION OF ENGINEER-IN-CHARGE. CUM
ACT956 SUPPLYING FITTING AND FIXING GI CHAIN LINK FENCING 75MM X 75 MM MESH 8 G WIRE TO THE RCC OR WOODEN POST WITH GALVANISED HOOKES COMPLETE SQM
ACT98 EARTH WORK IN ORDINARY SOIL ALL LEAD AND  LIFT INCLUDING ROUGH DRESSING AND BREAKING OF CLODS TO MAXIMUM 5 CM TO 7 CM AND LAYING IN LAYERS NOT EXCEEDING 0.3 M IN DEPTH AS PER DIRECTION OF ENGINEER IN CHARGE. CUM
ACT997 PIT SETTING AND SUPERVISING MANDAYS
ACT998 MAKING OF BAMBOO SHADE SFT
ACT999 EXCAVATION OF PIT INCLUDING DRESSING (IN CU.FT.) CFT